Carpentry + construction labor

Seven core trades. One coordinated crew plan.

Carpentry specialists and construction labor organized around the scope, sequence, and scale of the assignment.

A carpenter checking a steel connector on a heavy timber beam
Carpentry at work
01

Drywall carpenters

Board installation, interior partitions, and ceiling assemblies. Crews move through the work areas the schedule has opened, with field leadership keeping that sequence tied to access.

05

Interior trim carpenters

Doors, base, casing, and finish carpentry. Trim moves when the walls and rooms are ready, and punch stays in the plan until the scope is complete.

02

Steel stud carpenters

Metal stud walls, soffits, and associated framing. The wall systems drywall and trim depend on, built across the zones the project has released.

06

Concrete labor

Placement support, material handling, and pour cleanup. Paired with form carpentry when the assignment is structural, and staffed to the pour schedule.

03

Wood carpenters

Walls, floors, roofs, sheathing, and blocking. A defined package, run by field leadership against the areas that are actually open.

07

General labor

Material movement, jobsite support, and cleanup. A planned crew so those tasks do not fall on the trades that should be installing.

04

Form carpenters

Formwork assembly, bracing, and stripping, in support of the concrete sequence. Headcount follows the pour, from the first form to the last strip.

—

Large crews + on-site supervision

Trade mix and field leadership matched to the assignment.

Interior construction

Interior capacity for complex builds.

Large interior programs depend on coordinated crews moving through multiple work areas. US Carpentry supports that sequence with trade-specific teams and field supervision.

01

Steel stud framing

Carpenters for metal stud partitions, soffits, and framing support across active work zones.

02

Drywall installation

Crews for board installation, wall assemblies, and ceiling work within the agreed scope.

03

Interior trim

Finish carpenters for doors, base, casing, and other interior carpentry details.

From wall systems to finish details.

Metal stud walls filling a large open industrial interior, with lifts and a small crew
A carpenter aligning a metal stud wall inside a building
From wall systems to finish details.

Structural + site support

Capacity across the build sequence.

Support the work as it moves from structural carpentry and formwork to construction labor and completion activities.

01

Wood carpentry

Framing, sheathing, and blocking crews for defined work packages.

02

Form carpentry

Formwork assembly, bracing, and stripping to support the concrete sequence.

03

Concrete labor

Labor support for placement activities, materials, and pour cleanup.

04

General labor

Material handling, site support, and cleanup around active construction areas.

Where these crews are used
Workers placing a concrete pump hose across a rebar deck at an industrial plant
A worker on formwork beside a tall column of rebar